|
Last week, our electrical contractor needed to dig a 2 foot deep trench across the entire length of one lot and part way into another to repair a break in the electrical line between 2 pedestals. It was labor intensive and expensive ... without any obstructions.
When homeowners install pavers, gazebos, pergolas, and platforms on their lots, it makes repairs like this even more difficult and time-consuming. This is also the prime reason we do not allow any concrete patios or landings. Everything installed must be EASILY removable so repairs can be made to the underground water, sewer, and electrical lines. So ... if you plan to make ANY changes or additions on the outside of your trailer, please submit your plans to the Board for approval at [email protected] before any work begins. Thanks in advance for your cooperation. Comments are closed.
|
Archives
August 2025
Categories
All
|
RSS Feed